Skip to content

Conversation

@Tecoddy
Copy link
Contributor

@Tecoddy Tecoddy commented Dec 10, 2025

What does this PR do? What is the motivation?

Add retention period to 2 years and changed Change lead time requirement for better clarity and to include Gitlab integration.

Merge instructions

Merge readiness:

  • Ready for merge

For Datadog employees:

Your branch name MUST follow the <name>/<description> convention and include the forward slash (/). Without this format, your pull request will not pass CI, the GitLab pipeline will not run, and you won't get a branch preview. Getting a branch preview makes it easier for us to check any issues with your PR, such as broken links.

If your branch doesn't follow this format, rename it or create a new branch and PR.

[6/5/2025] Merge queue has been disabled on the documentation repo. If you have write access to the repo, the PR has been reviewed by a Documentation team member, and all of the required checks have passed, you can use the Squash and Merge button to merge the PR. If you don't have write access, or you need help, reach out in the #documentation channel in Slack.

Additional notes

Add retention period to 2 years and changed Change lead time requirement for better clarity.
@Tecoddy Tecoddy requested review from a team as code owners December 10, 2025 12:05
@github-actions
Copy link
Contributor

@joepeeples joepeeples self-assigned this Dec 10, 2025
Copy link
Contributor

@joepeeples joepeeples left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

A couple small edit suggestions, thanks!

@Tecoddy Tecoddy merged commit ad52fa9 into master Dec 11, 2025
16 checks passed
@Tecoddy Tecoddy deleted the teddy.gesbert/dora_metrics_small_edits branch December 11, 2025 09:34
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants